# Recommended installation order

This sequence follows the numbered IKEA schematics and keeps the user-requested approach: install the wall cabinets first, then the lower cabinets. Confirm the finished-floor height, stud locations, plumbing, electrical, appliance specifications, and countertop template requirements before fastening any cabinet.

## 1. Set out and prepare

- Mark the finished cabinet lines and find every stud.
- Install the SEKTION suspension rails (#19) level and securely into studs or appropriate blocking. Keep the wall-cabinet and base-cabinet lines independently level.
- Dry-fit appliance clearances and leave panels, fillers, doors, drawers, handles, and plinths off for now.

## 2. Upper cabinets — start at the left end of the long wall

1. **#11 — 18 in wall cabinet.** Establish the left end of the wall-cabinet run.
2. **#12 — 24 in wall cabinet.** Clamp and fasten it to #11 before fully tightening.
3. **#13 — 30 in microhood cabinet.** Verify the microhood's mounting height, centered location, and power/vent path before securing.
4. **#14 — 24 in wall cabinet.** Continue the aligned run to the right.
5. **#15 — 24 in wall cabinet.** Complete the run, leaving its wall-end allowance for #16.
6. **#17 — 36 in wall cabinet.** Install the separate wide wall cabinet shown on Face Plan 1 after its rail is confirmed level.

**Do later:** Cut and fit **#16 (wall-cabinet filler)** only after the adjoining cabinets are plumb, level, and fully joined. Do not use filler pieces to correct a cabinet run that is out of level.

## 3. Floor-standing tall/fridge area

7. **#8 — 15 in high cabinet.** Level and anchor the tall cabinet; check its door swing and its clearance to the adjacent wall/door opening.
8. **#18 — refrigerator top cabinet.** Install after #8 and the refrigerator opening have been confirmed. This cabinet is part of the tall/fridge grouping even though it is above counter height.

**Do later:** Cut and fit **#9 (high-cabinet filler)** only after #8, #18, and the refrigerator placement are final. Fit **#7 (freestanding refrigerator cover panel)** after the refrigerator and final side clearances are known.

## 4. Lower cabinets — corner runs first

9. **#2 — corner base cabinet with pull-out.** This is the anchor for the first base run. Set, level, and fasten it before its neighboring base cabinets.
10. **#1 — 18 in drawer base.** Install on one leg of #2; clamp, level, and join the cabinet faces.
11. **#3 — 18 in drawer base.** Install on the other leg of #2 and repeat the alignment checks.
12. **#4 — corner base cabinet with pull-out.** Anchor the second corner run.
13. **#5 — HAVSEN sink base.** Set it next to #4, but do not make final sink/plumbing cutouts until the countertop plan is confirmed.
14. **#6 — pull-out base cabinet.** Complete the second corner run and verify the pull-out clears adjacent doors and handles.

## 5. Island and finish work

15. **#10 — island cover panels.** Fit only after the island/base position and countertop overhang are final; these are finish panels, not an independent cabinet box.
16. Install **#20 (legs and plinths)** after all base boxes are level and connected.
17. Add **#21 (cover panels)**, then **#22 (deco strips and cornices)** after appliances and countertop details are final.
18. Install doors, drawer fronts, **#23 (knobs, handles, and dampers)**, and **#24 (lighting accessories)** last. Adjust reveals only after every neighboring cabinet is secured.

## Checkpoints before moving on

- Each cabinet box is level, plumb, securely anchored, and joined to its neighbor before adding the next one.
- Confirm appliance clearances before installing the microhood cabinet (#13), tall/fridge grouping (#8/#18), sink base (#5), or panels.
- Keep cover panels and fillers oversized until adjacent cabinets, appliances, and the countertop are in their final positions.
- Follow the current IKEA SEKTION assembly instructions and all local electrical/plumbing requirements; this is a project sequence, not a substitute for those instructions.
